Wednesday, May 23, 2007

Pre Cast Panel Transport

Once Casted, the panels are transported to site. Transport is not too complicated. Panels are crane lifted onto trucks. These trucks have specially angled racks, as you can see in images below. It is also obvious that chain tie downs are used to hold the panels to the trucks, these tie downs must be strong, as once travelling, the panel encounters the dynamic lateral load of wind.