skip to main | skip to sidebar

Jurey's Blog

Tuesday, May 22, 2007



Downpipe section

Posted by Jurey at 2:48 AM

2 comments:

SRT251_rob kuebler's blog said...

Brenton,
Unless you are going to show the whole wall construction from roofing to footing, a drawing such as this does not tell us much. More info needed.R.K.

May 22, 2007 at 5:34 AM
Jared van Heerden said...

Hey man like the blog. Nice site visits

May 28, 2007 at 10:55 PM

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ▼  2007 (15)
    • ▼  May (14)
      • Articles
      • LINKS
      • Complete model, focus= connection between portal f...
      • Steel Fabrication
      • Portal Frame "close ups"
      • Tilt Slab site visit, Geelong Road, Geelong West
      • Pre Cast Panel Transport
      • Visit To "COEN Pre-cast panels" in Moolap
      • Site visit, VICROADS Geelong CBD.
      • Downpipe section
      • Downpipe and Spreader Section
      • QUICKSILVER EXTERNAL WALLTO ROOF CONNECTION D...
      • PORTAL FRAME SECTION 2"THE OTHER WAY"
      • PORTAL FRAME SECTION
    • ►  March (1)

About Me

Jurey
View my complete profile